Journal of the Japan Society of Erosion Control Engineering, Vol.59,No.5,2007

Case study about sediment control by a series of slit sabo dams

Kiyomi TANIGUCHI Tomoo MATSUBARA Akemi KUMAKURA Toshihiro KIKUI Takahisa MIZUYAMA


Abstract

Iide Sankei Sabo Work Office has been advanced to provide slit in existing sabo dams so that to improve the sediment control function and consideration of river environment (water quality improvement, to allow passing of fish). However, the effect of a series of slit sabo dams is not clear, though some researches exist. The purpose of this research is to get the supporting data for the decision of basic policy to provide slit in existing sabo dams at jurisdiction basin in the future by examining the effect of a series of slit sabo dams with one]dimensional river bed simulation on a model river basin Kaminosawa.

Key words:dam, slit sabo dam, sediment control

Japan Society of Erosion Control Engineering
Sabo Kaikan Bekkan 3F, 2-7-5 Hirakawa-cho, Chiyoda-ku, Tokyo
Phone +81-3-3222-0747 Fax +81-3-3230-6759
http://www.jsece.or.jp/
Mail jimu@jsece.or.jp