Journal of the Japan Society of Erosion Control Engineering, Vol.57,No.2,,2004

A method of establishing objective priority order of construction of countermeasure facilities against steep slope failure using data envelopment analysis

Soichi KAIHARA, Masao ARAKAWA, Takeharu SATO, Hirotaka NAKAYAMA, Kohei FURUKAWA

Abstract

There is a tendency that the dangerous area of slope failure is increasing cause of the residential land development nearby mountains district part around city. An enormous cost and time are necessary to take construction of countermeasure facilities to every dangerous area of slope failure. Therefore,The establishment of objective priority order of construction plan is needed. In this paper Authors proposed the objective establishment method on priority order of construction by using Data Envelopment Analysis.And Validity of the method is proved engineering instances of the construction.
Key wordsFdata envelopment analysis, physical measures, priority of countermeasure construction, slope failure prevention work
Japan Society of Erosion Control Engineering
Sabo Kaikan, 2-7-5 Hirakawa-cho, Chiyoda-ku,
Phone +81-3-3222-0747 Fax +81-3-3230-6759
http://www.jsece.or.jp/
Mail jimu@jsece.or.jp